
Today only, Best Buy's Deals of the Day section has a selection of laptops and and desktops, discounted by as much as 40%. You'll find budget picks from an HP OmniBook 3 at $499.99 ($200 off) to a Lenovo Legion 7a gaming laptop at $2,099.99 ($450 off). Shipping is free and these deals end today. Shop Now at Best Buy
- Dell 15.6" 2K touchscreen laptop with Intel Core i7, 16GB memory, and 512GB storage for $619.99
- Lenovo Legion 7a 15.3" 3K OLED gaming laptop with 32GB memory and 1TB storage for $2,099.99
- HP OmniBook 3 14" 2K OLED laptop with Snapdragon X chip, 16GB memory, and 256GB SSD for $499.99
- HP OmniDesk Slim desktop with AMD Ryzen 7 processor, 8GB memory, and 512GB SSD for $579.99
- Lenovo Yoga 7i 2-in-1 16" 2K touchscreen laptop with Intel Core Ultra 5 processor for $749.99
- MSI Aegis ZS2 gaming desktop with AMD Ryzen 9 processor and NVIDIA GeForce RTX 5060Ti graphics for $1,699.99

This PNY 32GB microSDHC 3-pack is $18, down from $35. It's the best price we could find by $9. Each card offers read speeds up to 100MB/s and comes rated as drop-proof, magnet-proof, temperature-proof, and waterproof, with an SD adapter included for use in cameras and computers. Buy Now at Amazon

This Mac mini is $699 at Best Buy. It's the lowest price we found by $100. My Best Buy members get free shipping on all orders (it's free to join). Buy Now at Best Buy
- Apple M4 chip with Apple Intelligence
- 16GB RAM; 256GB SSD
- MacOS
- Model: MU9D3LL/A

This Lenovo Yoga 7i is $500 off the regular price of $1,249.99 at Best Buy. The 2-in-1 design lets it flip into a tablet, and it pairs a 16" touchscreen display with 16GB of memory and 512GB of storage. Shipping is free. Offer ends October 17 at 12:59 AM ET. Buy Now at Best Buy
- Intel Core Ultra 5 Series 3 2.5GHz 6-core CPU
- 16" 1920 x 1200 IPS touchscreen
- 16GB RAM & 512GB SSD
- Windows 11 Home

At T-Mobile, 5G Home Internet starts at $30 a month with a voice plan and AutoPay, and new customers can get one month free. Plus , you'll get a $100 prepaid Mastercard with the Rely and Amplified plans, or a $200 prepaid Mastercard with the All-In plan, with the rebate taking about 7 weeks to arrive. Plans come with no annual contract, no equipment fees, and a 5-year price guarantee on the monthly rate. Deal ends December 2. Buy Now at T-Mobile Home Internet
- No annual contracts required
- 5G Gateway device included at no extra cost
- Self-setup takes about 15 minutes using the T-Life app
- Same-day to 2-day delivery depending on location
- 15-day money-back guarantee on cancellation
- 5-year price guarantee on the monthly rate

This HP OmniDesk Slim desktop is $579.99, down from $919.99. That's the lowest we've seen. It pairs an AMD Ryzen 7 processor with 512GB of SSD storage and Wi-Fi 6 wireless connectivity in a space-saving design. My Best Buy members get free shipping on all orders (it's free to join). Offer ends October 17 at 12:59 AM ET. Buy Now at Best Buy
- AMD Ryzen 7 7000 Series 6-core CPU
- 8GB RAM & 512GB SSD
- Windows 11 Home

VideoProc offers its VideoProc Converter AI V7.8 for Windows or Mac for free as part of its anniversary giveaway. You'll need to provide an email address to receive a free license code. The giveaway version includes AI video, image, and audio enhancement tools, along with video conversion, compression, downloading, recording, and editing features. The latest AI models and future updates are not included.
Also, on the same page, VideoProc Converter AI's lifetime license is $40, down from $90. The price covers one Mac for life or three Macs for a year, and includes AI video, image, and audio enhancement tools alongside standard conversion, compression, download, and editing features. Buyers also get several bonus titles included, such as an image background editing tool and an iPhone file transfer app. Shop Now at VideoProc
- upscale and enhance videos and images
- restore old photos and colorize black-and-white images
- reduce background noise and stabilize shaky videos
- convert, compress, download, record, and edit videos
- includes AI enhancement tools from V7.8
- available for Windows and Mac

Woot's MSI Gaming Laptops sale covers factory reconditioned models ranging from the $869.99 MSI Thin 15 up to the $4,149.99 MSI Titan 18 HX AI. The lineup spans a wide range of screen sizes and graphics options, including several laptops built with RTX 50-series graphics. Shoppers looking for a specific MSI series have plenty to compare, from lighter creator-focused models to higher-end gaming rigs. This deal ends October 23. Buy Now at Woot! An Amazon Company

At Amazon, add this Orlian USB 3.0 Dual-Slot SD & Micro SD Card Reader to your cart and proceed to checkout to drop the price to $7.19. It's the best price Amazon has charged for this model.This Orlian card reader combines USB-C and USB-A connectors with dual card slots in a single adapter, so it works across phones, laptops, and tablets without needing separate adapters. It supports cards up to 2TB and transfers data at up to 5Gbps over its USB 3.0 connection. Buy Now at Amazon
- Includes both USB-C and USB-A connectors in one adapter
- Dual card slots support SD, SDHC, SDXC, MicroSD, MicroSDHC, MicroSDXC, RS-MMC, and MMC cards
- Supports cards with up to 2TB of storage
- USB 3.0 interface transfers data at speeds up to 5Gbps
- Aluminum housing with a protective lid for water and dust resistance
- No driver installation needed on Windows or Mac systems

As one of its daily deals, Best Buy has this Dell 15.6" laptop at $380 off its regular price. It's the best deal we've seen for this popular build in months. The laptop pairs a 13th Gen Intel Core i7 processor with 16GB of memory and 512GB of storage, plus a touchscreen display, which is less common at this price. Shipping is free, too. The deal ends today. Buy Now at Best Buy
- Intel Core i7-1355U 10-core CPU
- 16GB RAM, 512GB SSD
- Windows 11 Home

At Newegg, get the ASUS Vivobook 17 Core 7 150U 17.3" Laptop for $650. That's a savings of $250. Shipping is free. Buy Now at Newegg
- Intel Core 7 150U processor with integrated graphics
- 8GB DDR5 memory and 1TB SSD storage
- 17.3" Full HD (1920 x 1080) non-touch display
- Wi-Fi 6 wireless and Bluetooth 5.2

This Ugreen USB hub is $6.98, down from $9.99 at Amazon. It's the best deal we've seen for this model. It expands a single USB-A port into four and supports data transfer speeds up to 5Gbps, with a compact, travel-friendly design. Buy Now at Amazon
- transfer speeds up to 5Gbps
- plug and play
- 0.5-ft. cord

Best Buy offers the Acer Nitro Gaming EDB323QU 31.5" WQHD Curved Monitor for $190. That's $10 below our August mention and $270 off list price. Shipping is free. Buy Now at Best Buy
- 31.5" curved display with 2560 x 1440 WQHD resolution
- 180Hz refresh rate with 1 millisecond response time
- AMD FreeSync Premium for reduced screen tearing
- VA panel with zero-frame, near bezel-less design
- 2 HDMI inputs and one DisplayPort input
- Tilt adjustment from -5 to 20 degrees

Digitalkeysbox offers the Microsoft Office Standard 2024 for Home for Windows 10/11 2-PC Lifetime License for $19.99 (reduced from $219.99) via coupon code "DNSTD2024". Buy Now at Digitalkeysbox
- One-time purchase, not a subscription. Lifetime license.
- Includes Word, Excel, PowerPoint, Outlook, and OneNote (no Access or Publisher)
- Activates on up to 2 separate PCs
- Instant digital delivery by email
- Windows 10 / 11 only, not for Mac

At Newegg, save $260 on this CyberpowerPC desktop. It comes with a free AMD ONIMUSHA Game Bundle. Buy Now at Newegg
- AMD Ryzen 7 9800X3D 8-core processor
- 32GB DDR5 memory
- 2TB NVMe solid state drive
- AMD Radeon RX 9070 XT graphics card w/ 16GB of video memory
- 1000W power supply w/ liquid cooling
- Windows 11 Home included

Using promo code SSF73982 brings this ABS Stratos II Aqua gaming PC down to $2,499.99. That makes for a total savings of $500. Buy Now at Newegg
- Intel Core i9-14900KF 24-core processor
- GIGABYTE GeForce RTX 5070 Ti 16GB Windforce SFF OC graphics card
- 32GB (2x16GB) G.SKILL Ripjaws M5 Neo RGB DDR5-6000 dual-channel memory
- 2TB Team Group NV5000 PCIe 4.0 NVMe SSD
- GIGABYTE Z790 UD AC motherboard w/ multiple M.2 slots
- 240mm AIO cooler, 850W 80+ Gold power supply, Wi-Fi 5 & Bluetooth 4.2

PCLiquidations is offering an extra 20% off its blemished tech, already marked up to 65% off, via promo code "SCRATCHNSAVE26", covering refurbished laptops, desktops, and monitors with minor cosmetic scratches but full working performance. The sale spans a wide range of categories, from a Dell Precision 5810 tower down to compact Dell Latitude ultrabooks, with brands like HP, Lenovo, ASUS, and Microsoft Surface also included. All units are tested before sale, so the discount applies to hardware that functions like new despite the cosmetic flaws. Orders of $500 or more get free shipping. All items ship with a 1-year warranty and 30-day return window. Shop Now at PCLiquidations
- Refurbished laptops, desktops, and monitors with minor cosmetic scratches
- All units fully tested for performance before sale
- Brands include Dell, HP, Lenovo, Acer, ASUS, and Microsoft Surface
- Monitors range from 20" to 27" screens
- Desktops include options with Intel Core i5 and i7 processors
- Laptops range from 12.4" to 17.3" screens

Lenovo's doorbuster deals cover a wide mix of categories, from laptops and tablets to desktops, monitors, and accessories. The Yoga 7i 2-in-1 16" laptop with an Intel Core Ultra 5 processor is $999.99, while the Lenovo Tab One drops to $99.99. With 84 items included, the sale spans everything from budget tablets to business-focused ThinkPad laptops like the ThinkPad E16 Gen 3 at $1,219. Shop Now at Lenovo
- Laptops, desktops, tablets, monitors, servers, and accessories included
- Yoga 7i 2-in-1 16" laptop with Intel Core Ultra 5 processor, $999.99
- ThinkPad E16 Gen 3 16" business laptop, $1,219.00
- Lenovo Tab One 8.7" Android tablet, $99.99
- Lenovo Idea Tab 11" tablet, $149.99
- 84 items currently marked as doorbuster deals

Target offers a range of Asus laptops, monitors, routers, and more at up to 40% off. We've pictured the ASUS Vivobook 16 16" Ryzen 7 170 Laptop for $783 ($117 off). Shipping is free. Shop Now at Target
- Laptops, monitors, routers, and desktop PCs included
- Discounts up to 40% off list prices
- Gaming laptops and monitors from ASUS among the deals
- Some refurbished items included alongside new models
- Free shipping available with exclusions

At eBay, use promo code "COUNTDOWN20" to get an extra 20% off already-discounted laptops, desktops, tablets, and more. The sale spans categories like laptops, tablets, monitors, and desktops from brands such as Apple, Dell, Lenovo, and MSI, with many listings being certified refurbished with warranty coverage. For example, a refurbished Apple iPad 11th Gen with 128GB is listed at $332.36, down from $599. Refurbs include 1- or 2-year Allstate warranties. Deal ends October 11. Shop Now at eBay

HP’s All-In Plan offers hassle-free printing from $7.99 per month, with a new HP printer, automatic ink delivery, continuous printer coverage, and shipping included. You'll get 24/7 Pro live support and replacement coverage if an issue can’t be fixed remotely.
The HP All-In Plan includes a 30-day risk-free trial with no upfront costs. Customers can sign up, pay nothing today, and receive the printer shortly after enrolling. If it’s not a fit within the first 30 days, they can return the printer at no cost. Buy Now at HP All-In Plan

The Staples Easy Deal Days event has just gone live with discounts of up to 60% live across the store. Custom cards, labels, and wrapping paper is marked at 60% off, while you can get 40% back in Rewards points on all ink, toner, and printers. Apple iPads are discounted by $100, toys and games by up to 30%, and reams of paper are also highly-discounted. The sale also includes K-Cup coffee pods from brands like Dunkin', Green Mountain, and Folgers at $19.99 each when buying two or more with the promo code "82092". You'll need an EasyRewards account to access most of these deals, but it's free to join. The sale is live for two weeks only. Shop Now at Staples
- Up to 35% off select HP printers, including inkjet, laser, and supertank models
- HP OfficeJet Pro 9125 wireless all-in-one printer at $189.99, down from $309.99
- HP DeskJet 2955 wireless all-in-one printer at $49.99, down from $89.99
- K-Cup coffee pods priced at $19.99 each, 40 to 48 count boxes, when buying 2 or more with promo code
- Coffee pod brands include Dunkin', Green Mountain, Folgers, and Newman's Own

Digitalkeysbox offers the Kid-Ready PC Bundle with Windows 11 Pro, Microsoft Office Professional 2024, and Cisdem AppCrypt for $24.99 (reduced from $39.99) via coupon code "HOMEWORK15". Buy Now at Digitalkeysbox
- Windows 11 Pro + full Office 2024 Pro (Word, Excel, PowerPoint, Outlook, OneNote, Access).
- Cisdem AppCrypt included: lock games and apps with a password, block websites and adult content, set schedules for school nights. Covers 1 PC.
- 3 separate keys: install everything on one PC or split across different computers.
- One-time purchase, not a subscription. For Windows 10 / 11.
- Instant digital delivery within minutes.

Get lifetime licenses for Microsoft Office Professional 2024 and Microsoft Visio 2024 for $14.99 with code "DNVISIO" (reg. $49.99). One-time purchase, no subscription, and no renewal fees. The bundle ships two separate product keys, so you can put both on one PC or use them on two different computers. Office Professional includes Word, Excel, PowerPoint, Outlook, OneNote and Access. Visio 2024 covers flowcharts, org charts, floor plans and network diagrams. Delivery is instant, both keys and setup instructions arrive by email right after checkout. Buy Now at Digitalkeysbox
- Two separate lifetime keys included
- Windows 10 and Windows 11 only, not for Mac
- Publisher is not included, Microsoft retired it in Office 2024
- Instant digital delivery

DigitalKeysBox offers Microsoft Office Standard 2024 for 2 Windows PCs for just $11 (normally $24.99) when you apply promo code "DEALNEWSOCT11" at checkout. That's just $5.50 per PC for Word, Excel, PowerPoint, Outlook, and OneNote. Get lifetime licenses for both PCs with instant digital delivery — no subscriptions or renewal fees. Buy Now at Digitalkeysbox
- Lifetime license for 2 separate Windows PCs
- Includes Word, Excel, PowerPoint, Outlook, & OneNote
- Compatible with Windows 10 and Windows 11
- Instant digital delivery
- One-time purchase — no subscription required
Computers: The Basics
Shopping for computers doesn’t have to drain your savings — if you know how to find the best prices. Our team of experts review the sales and publish the best computer deals so you don’t have to work half as hard. Events like Prime Day at Amazon can mean finding truly great deals when you least expect them. Wondering "when is Prime Day this year?" We've got all the info you need to get the best offers.
Basic Computer Terminology
You don’t have to be a tech wiz to buy your next computer. Make note of these common terms to help you when you’re shopping computer sales!
- Operating System (OS): This is the system that controls how your computer performs basic functions. The most common operating systems you’ll see right now are Windows 10 and Mac OS X. They perform comparably, so picking one relies on personal preference.
- Random-access memory (RAM): The short-term memory of your computer. Your RAM controls how quickly and efficiently your computer is able to switch between tasks. The higher the RAM, generally, the better the performance.
- Processor (CPU): The powerhouse or “brain” of the computer, your processor handles your computer’s basic instructions, such as using your mouse and keyboard, or running applications. The two most popular CPU manufacturers are AMD and Intel. You can read about which processor is right for you in this article from Digital Trends.
- Storage: There are two types of physical computer storage, hard drives (HD) and solid state drives (SSD). SSD storage is more common these days because they are more stable and faster. While it’s ideal to aim for greater storage space, a bigger drive will cost more money. Determine your storage needs based on how you plan to use your computer. Abt recommends starting with at least 500 GB of storage space.
What Deals Are Available on Disney+ Bundles?
Disney+ bundle deals provide significant savings when combining services. For example, the Verizon Disney Bundle offered six months of Disney+, Hulu, and ESPN+ for free with select Unlimited plans. Bundles like the Disney+ Premium annual plan ($159.99) save you the cost of two months compared to monthly payments. Bundle options like the ad-supported Duo Basic plan (Disney+ and Hulu) start at $10.99 per month, while ad-free Duo Premium is $19.99. Learn more on the Disney+ Bundle Deals page.
How Much Is a Disney+ Subscription?
Disney+ subscriptions currently start at $8 per month for the ad-supported Basic plan, while the Premium ad-free plan is priced at $13.99 per month or $139.99 annually. Prices will increase beginning October 17, 2024, with the Premium plan rising to $15.99 per month or $159.99 annually. Explore all pricing options on the Disney+ Subscription Costs page.
Best Disney+ Deals
Disney+ offers value-packed streaming bundles, such as the Disney+, Hulu, and Max bundle starting at $17 per month with ads or $30 per month ad-free. Disney+ also supports paid sharing, allowing you to add one extra member for $6.99 per month with Basic or $9.99 per month with Premium. Prices are increasing on October 17, 2024, so finding deals like these is more important than ever. For more information, visit our Best Disney+ Deals page.
Annual Disney+ Subscription Costs
Disney+ Premium annual plans cost $139.99 but will rise to $159.99 on October 17, 2024. Opting for the annual plan saves you the equivalent of two months compared to monthly billing. Note that annual payments are only available for standalone Disney+ Premium plans and not for bundles. Customize your subscription to include ad-supported or ad-free options with Hulu, ESPN+, or Max. See all pricing details on the Disney+ Subscription Costs page.
Frequently Asked Questions
What is a VPN?
VPN stands for “virtual private network.” A VPN protects your internet usage by routing your internet connection through a private server. Using a VPN keeps your online browsing more private and also grants you access to websites and content that may not be available in your country.
For more information about VPNs, visit our NordVPN Free Trial Guide and our NordVPN Subscription Cost Page.